首页 社会内容详情
皇冠博彩:KPower gets four-year PPA extension

皇冠博彩:KPower gets four-year PPA extension

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

欧博allbet网址www.allbet8.vip是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

皇冠博彩www.hg9988.vip)是皇冠体育官方博彩平台,开放皇冠信博彩代理申请、博彩会员开户的线上博彩的官方平台。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

发布评论